Using BIM (IIM) on Construction Management Projects

  1. Smart Phones for Inspectors
  2. Netbooks for Inspectors
  3. Rover training for inspectors
  4. Rovers on CM projects
  5. Metrics / find efficiencies
  6. Develop system & accessibility to 3D models & data on CM projects
  7. Night Work GPS Difficulties
  8. Surface Training
  9. Project Websites
  10. Earthwork in real-time
  11. Earthwork for finals
  12. Pre-Construction Plan checking
  13. Modeling Software training
  14. Utilize 3D Data / Modeling for traffic control
  15. Real-time as-builting
  16. Borrow pit / pre-construction data
  17. 3D models from Design to Construction
  18. Design Build Partnerships
  19. Buy Excavation Contractor
  20. Summarize how digital process creates efficiencies every day
  21. Project BLOG
  22. Anticipate In field conflicts with 3D data
  23. Prevent contract modifications
  24. IDR’s done in truck
  25. RFID use
  26. GPS in dump trucks for load counts
  27. Google Earth Training with Trimble
  28. Scanning Truck Beds for Volumes
  29. Quantities in real time
  30. Incident management / traffic mitigation
  31. Differ site conditions / data collections
  32. On the fly design changes
  33. Utilize 3D Data for presentations and wow factor
  34. VRS Rover use
  35. Satellite imagery as-builting
  36. Videotaping pre / post / staged construction
  37. GPS on cameras
  38. Monitor to advance 3D Technologies
  39. Gather GIS Data for local clients – Counties / Muni’s
  40. GIS deliverables – find out what locals have /need
  41. Public Involvement
  42. Communication between all DM staff (WisDOT / Kapur / Subs / Contractors)
  43. Produce Pretty Picture Models
  44. Utilize for records
  45. Drawings in web format
  46. Utilize IT / BIM for project interfaces
  47. Traffic Control LCS
  48. Use satellite info for construction layout
  49. Real time plan navigation
  50. Wetland Delineation
  51. Verification Survey
  52. End of Project Construction Debriefings
  53. Bridge Modeling
  54. Sign Placement
  55. Critical Clearance
  56. Utility Coordination
  57. Utilities’ Work plan in Model
  58. Accurate 3D Utilities in Model <-- BHAG
  59. Replace locating companies
  60. 1 model
  61. Monitor proving period – warranted itemsText Color
  62. Manage WisDOT’s transportation system via satellite imagery
  63. Setup system to watch state for environmental problems via satellite imagery
  64. Identifying punch list items Punch list Management System (PMS)
  65. Programmer
  66. Documenting Erosion Control Issues
  67. Project GIS
  68. Track questionable (substandard) items and materials over time
  69. Monitoring Wells Data
  70. Monitor / Track Testing – depth checks – nuclear density – air testing
  71. Intelligent compaction